- Breaking capacity differs from rated current
- Some models have adjustable trip functions
- Auxiliary contacts can report status
What should you verify when selecting?
- Select breaking capacity for prospective fault current
- Coordinate upstream and downstream trip curves
- Check continuous generation current and environmental derating
| Rated current | Coordinate conductor and load |
|---|---|
| Breaking capacity | Meet prospective short-circuit current |
| Settings | Based on protection-coordination calculations |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Protection calculation
Define protected equipment and setting criteria.
2
Correct wiring
Install to drawings and check line/load requirements.
3
Testing and records
Record settings and test results before authorised operation.
Operation & maintenance guidance
Correct use
- Investigate trips before resetting
- Do not adjust trips without permission
- Open and close only under permitted conditions
During operation
- Inspect operating mechanisms
- Check contact heating
- Verify protective operation periodically
Common misuse
- Increasing breaker capacity instead of fixing faults
- Confusing rated current with breaking capacity