Permanent Labels, Wire Numbers and As-Built Records

Links modules, circuits, switches and drawings for fault location, safe isolation, warranty support and end-of-life traceability.

Features & function

  • Weather-resistant labels remain readable
  • Unique IDs avoid asset confusion
  • Digital records must match the field

What should you verify when selecting?

  • Standardise codes and language
  • Select materials for UV exposure and substrate
  • Define acceptance records and backup formats
DurabilitySuit outdoor UV and temperature
CodingKeep field, drawings and platform consistent
RecordsInclude models, serial numbers and circuits

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Coding plan

Create IDs by plant area, array and circuit.

2

Field identification

Install durable labels and hazard notices at approved locations.

3

Record verification

Sample-check correspondence with drawings and asset schedules.

Operation & maintenance guidance

Correct use

  • Update records after every replacement
  • Reference asset IDs in work orders
  • Retain original certificates and test reports

During operation

  • Replace faded labels
  • Check drawing revisions
  • Back up asset and warranty files

Common misuse

  • Using QR codes without human-readable IDs
  • Leaving obsolete platform locations after replacement