Features & function
- Reduces or limits roof penetrations
- Weight and wind loads constrain each other
- Protective-pad compatibility affects roof life
What should you verify when selecting?
- Check remaining roof load capacity
- Assess edge-zone uplift and sliding
- Confirm membrane and protective-pad compatibility
| Weight | Based on the wind design for each zone |
|---|---|
| Friction | Based on tested roof-and-pad interface conditions and the design |
| Roof | Confirm load capacity and waterproofing suitability |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Structural review
Obtain the roof-load assessment and wind-resistance design.
2
Base positioning
Protect the membrane and preserve drainage routes.
3
Ballast placement
Check quantity and location against zone drawings; do not move blocks arbitrarily.
Operation & maintenance guidance
Correct use
- Keep roof drains accessible
- Record ballast moved during maintenance
- Recalculate before changing the layout
During operation
- Inspect sliding and protective pads
- Check ponding and leaks
- Verify ballast positions after storms
Common misuse
- Applying identical ballast across every roof zone
- Blocking existing drainage with ballast
Technical sources & manuals
- IronRidge: Rooftop Rails and Installation Documentationwww.ironridge.com
- US Department of Energy: PV Installation and Commissioningwww.energy.gov