Photograph of the surface and cells of a photovoltaic moduleReal photography
Real equipment or site photograph; not a specific model · Source & license
PV modulesCommercial & industrial roofsGround-mounted plantsResidential

Bifacial Glass-Glass PV Module

Uses light on both front and rear surfaces. Rear-side gain depends on ground reflectance, clearance and structural shading; it is not a fixed percentage.

Features & function

  • Rear illumination can contribute additional current
  • Rear glass requires appropriate handling arrangements
  • Suitable for projects that model rear-side illumination

What should you verify when selecting?

  • Check current including bifacial gain
  • Assess rear shading from structures and cables
  • Model yield using reflectance and row spacing
BifacialityUse the model test report
GainConfirm through site modelling and measurements
CurrentInclude design allowances in protection and inverter selection

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Site assessment

Simulate seasonal shading and effective rear illumination.

2

Handling and mounting

Select handling equipment for the weight and protect both glass surfaces.

3

Monitoring acceptance

Ensure bifacial parameters and field irradiance measurements use consistent definitions.

Operation & maintenance guidance

Correct use

  • Monitor soiling on both surfaces
  • Use measurements to refine gain forecasts
  • Do not place opaque objects behind modules without assessment

During operation

  • Inspect rear-glass cracks
  • Remove unexpected rear shading
  • Check vegetation beneath structures

Common misuse

  • Equating bifaciality with energy-yield gain
  • Ignoring rear-side current and exceeding input limits

Technical sources & manuals

Search stages, equipment, terms and operating issues. Press Esc to close.