Features & function
- Dimensions vary with loads and ground conditions
- Embedded parts control installation accuracy
- Foundation elevation affects flooding risk
What should you verify when selecting?
- Confirm final equipment loads and base drawings
- Coordinate embedded conduits and earthing
- Check drainage, transport and lifting space
| Concrete grade | Specified by structural design |
|---|---|
| Elevation | Based on flood and drainage conditions |
| Anchors | Match the equipment manufacturer’s base drawing |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Design coordination
Check foundation, trench and equipment drawing revisions.
2
Placement and curing
Follow the approved method and retain concrete-test records.
3
Handover inspection
Recheck dimensions, strength and anchor positions before equipment installation.
Operation & maintenance guidance
Correct use
- Maintain drainage around equipment
- Obtain structural review before adding openings
- Retain concealed-work records
During operation
- Track changes in cracks
- Inspect anchors and grout
- Remove standing water and sediment
Common misuse
- Lifting equipment onto foundations before acceptance conditions are met
- Discovering cable-entry conflicts after construction