Features & function
- Die geometry affects connection quality
- Gauges and sample checks reveal defects
- Tool wear can cause batch-wide problems
What should you verify when selecting?
- Select connector-manufacturer-approved tools
- Match cable and contact sizes
- Provide stripping tools, gauges and training
| Compatibility | Contacts, dies and cable must form an approved combination |
|---|---|
| Inspection | Follow the manufacturer’s process |
| Traceability | Record personnel, tools and batches |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Combination verification
Check approved cable, contact and die lists.
2
Process preparation
Establish first-article inspection to manufacturer instructions.
3
Batch inspection
Trained personnel assemble and retain inspection and tool records.
Operation & maintenance guidance
Correct use
- Never substitute ordinary pliers
- Approve the first article before production
- Quarantine related batches after tool abnormalities
During operation
- Inspect die wear
- Service and calibrate as required
- Keep tools clean and corrosion-free
Common misuse
- Cutting factory leads without an approved procedure
- Treating pull resistance as the only crimp acceptance criterion
Technical sources & manuals
- Stäubli: MC4 Assembly Instructions MA231www.staubli.com
- Stäubli: Original Connector Tools and Accessorieswww.staubli.com
