DC Isolator and Switch-Disconnector

Provides isolation or load-switching functions under specified conditions. Whether operation under load is permitted depends on the device’s rated duty.

Features & function

  • DC arc interruption differs from AC
  • Polarity and series-connected pole requirements may apply
  • Outdoor enclosures need weather protection and cooling

What should you verify when selecting?

  • Distinguish isolation-only devices from load-break switches
  • Check utilisation category, voltage and current
  • Assess access and lockout capability
DutySpecify isolation or permitted load switching
VoltageMatch the actual DC system
ProtectionSuit the installation environment

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Circuit verification

Check schematics against manufacturer wiring requirements.

2

Installation and connection

Electricians verify fastening, sealing and polarity.

3

Functional checks

Confirm isolation and labels under the approved switching plan.

Operation & maintenance guidance

Correct use

  • Operate only under approved procedures
  • Keep handles visible and accessible
  • Stop use and report unusual sounds or burning smells

During operation

  • Check water ingress
  • Inspect contact heating
  • Check labels and locks

Common misuse

  • Assuming modules stop generating when the switch is off
  • Copying AC switch wiring arrangements