Features & function
- Must match the PV DC topology
- May provide failure indication or remote signalling
- Connection length affects protection performance
What should you verify when selecting?
- Calculate maximum continuous operating voltage
- Select protection type from lightning risk
- Coordinate backup protection and earthing paths
| Type | Selected within the overall lightning design |
|---|---|
| Continuous voltage | Accommodate maximum string voltage |
| Remote signalling | Match the monitoring point list |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Lightning design
Confirm building lightning protection and protection zones.
2
Coordinated installation
Place devices and compact connections as designed.
3
Status verification
Test indication and remote signals; record replacement models.
Operation & maintenance guidance
Correct use
- Monitor status indicators and alarms
- Inspect after thunderstorms
- Replace failed units during planned isolation
During operation
- Check failure indication
- Inspect earthing connections
- Check thermal damage
Common misuse
- Treating an SPD as complete direct-strike protection
- Routing earthing leads unnecessarily far
Technical sources & manuals
- DEHN: Lightning and Surge Protection for Rooftop PVwww.dehn-international.com
- Schneider Electric: PV DC Protection Devicesdownload.se.com