Features & function
- Touch and step voltages require assessment
- Continuity matters as much as earth resistance
- Soil corrosion and seasonal changes affect performance
What should you verify when selecting?
- Obtain soil-resistivity and related data
- Coordinate power and lightning earthing
- Select corrosion-resistant, compatible connections
| Conductor | Designed for fault current and corrosion |
|---|---|
| Test criteria | Follow local design and system requirements |
| Connections | Use methods compatible with metals and environment |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Buried installation records
Install to drawings and photograph concealed works.
2
Bonding verification
Check continuity of modules, structures and enclosures.
3
Testing and handover
Qualified specialists verify the design requirements and establish a baseline.
Operation & maintenance guidance
Correct use
- Do not remove bonding links without authorisation
- Verify continuity again after alterations
- Schedule testing from site records
During operation
- Inspect corrosion and disconnections
- Track earthing-performance trends
- Check restored bonding after maintenance
Common misuse
- Treating one resistance value as proof of complete safety
- Allowing corrosion from incompatible metal contact