Features & function
- Strategies depend on tariffs, loads and metering
- Can coordinate solar, storage and consumption
- Returns must include losses and battery depreciation
What should you verify when selecting?
- Define objectives and control priorities
- Check interfaces and offline behaviour
- Require permissions, audit logs and exportable records
| Control interval | Set by required service response |
|---|---|
| Constraints | Respect BMS and grid limits |
| Returns | Calculate from complete operating records |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Requirements modelling
Translate tariffs, loads and grid limits into rules.
2
Point-list integration
Check metering direction, time and equipment status.
3
Trial operation
Validate strategies and fallback behaviour at restricted power.
Operation & maintenance guidance
Correct use
- Review actual savings against cycling costs
- Reassess strategies after tariff changes
- Retain clear manual-override priorities
During operation
- Back up strategies and databases
- Review forecast errors
- Audit accounts and interface permissions
Common misuse
- Estimating net returns from tariff spreads alone
- Continuing stale power commands after communication loss