Features & function
- Distinguishes forward and reverse energy
- CT/PT ratios determine final readings
- Monitoring and settlement meters may serve different roles
What should you verify when selecting?
- Confirm ownership boundaries and metering points
- Match accuracy and transformer ranges
- Check protocols, certification and verification requirements
| Accuracy | Select for settlement or monitoring use |
|---|---|
| Ratios | Match CT/PT nameplates |
| Direction | Clearly define import and export |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Metering agreement
Confirm position, connections and verification with the network operator.
2
Specialist connection
Check phase sequence, direction and transformer ratios.
3
Reading validation
Verify power direction and platform readings under a known operating condition.
Operation & maintenance guidance
Correct use
- Reconcile inverter and meter totals periodically
- Check polarity when power direction is unexpected
- Maintain sealed equipment only with permission
During operation
- Check communication interruptions
- Verify tariff periods and time
- Arrange required meter verification
Common misuse
- Reversed CTs disabling export-limit control
- Using inverter totals directly as settlement energy
Technical sources & manuals
- Schneider Electric: Utility-Scale Solar and Storage Distribution Solutionswww.se.com
- Huawei: SmartLogger3000 User Manualinfo.support.huawei.com