Features & function
- Ground conditions can vary substantially across a site
- Seasonal water levels affect design
- Testing must produce a formal report
What should you verify when selecting?
- Use qualified specialists to plan investigation points
- Cover weak and filled-ground areas
- Coordinate foundation and earthing data needs
| Coverage | Based on strata and project scale |
|---|---|
| Depth | Based on foundation influence zones |
| Resistivity | Interpret with soil layers and seasonal conditions |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Investigation briefing
Define site limits, proposed loads and hazardous areas.
2
Specialist investigation
Sample and test under the approved plan while protecting the site.
3
Application of results
Designers interpret findings and identify further investigation needs.
Operation & maintenance guidance
Correct use
- Report unexpected ground conditions
- Review discrepancies found during construction
- Maintain traceability between samples and results
During operation
- Calibrate instruments
- Inspect test leads
- Backfill and mark investigation holes
Common misuse
- Using one soil result for the entire site
- Considering earthing conditions only after construction
Technical sources & manuals
- US Department of Energy: PV Installation and Commissioningwww.energy.gov
- DEHN: Lightning and Surge Protection for Rooftop PVwww.dehn-international.com