Features & function
- Operation relies on CT/PT inputs and trip circuits
- Event records support fault investigation
- Protection and monitoring serve different roles
What should you verify when selecting?
- Define network-required protection functions
- Check instrument transformers and auxiliary supplies
- Set procedures for settings management and time synchronisation
| Functions | Configure to the approved grid scheme |
|---|---|
| Settings | Calculated and approved by protection specialists |
| Interfaces | Match CT/PT inputs and plant controls |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Drawing review
Check logic, circuits and the approved settings sheet.
2
Secondary testing
Specialists verify measurement and trip circuits.
3
End-to-end acceptance
Confirm actual breaker operation and event transmission.
Operation & maintenance guidance
Correct use
- Approve every setting change
- Export disturbance and event records after trips
- Maintain auxiliary power and time synchronisation
During operation
- Perform periodic relay testing
- Check clocks and alarms
- Verify the complete trip chain
Common misuse
- Changing frequency thresholds by guesswork
- Testing the display without testing the trip chain