Features & function
- Fragile modules and heavy equipment need different handling gear
- Lifting routes determine work organisation
- Temporary stockpiles may exceed local roof capacity
What should you verify when selecting?
- Verify weight, centre of gravity and lifting points
- Plan transport, lifting and ground-bearing requirements
- Use lifting gear with inspection records
| Load | Consider actual weight and lifting method |
|---|---|
| Lifting points | Use manufacturer-approved positions |
| Weather | Follow the lift-plan restrictions |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Plan confirmation
Check routes, equipment weight and exclusion zones.
2
Gear inspection
Specialists inspect lifting accessories and packaging condition.
3
Controlled handling
Position equipment under the approved plan and reinspect its exterior.
Operation & maintenance guidance
Correct use
- Never carry modules while climbing ladders
- Never stand beneath suspended loads
- Stop when weather exceeds the lift-plan limits
During operation
- Inspect slings and lifting clamps
- Maintain equipment inspection records
- Remove damaged gear from service immediately
Common misuse
- Using module cables as handles
- Removing necessary supports before equipment is secured
Technical sources & manuals
- OSHA: Fall Protection in Solar Workwww.osha.gov
- JinkoSolar: Module Installation Manuals and Certificationsjinkosolar.us