Features & function
- Air terminals can shade modules
- Separation distances affect bonding arrangements
- Building and electrical specialists must coordinate
What should you verify when selecting?
- Review the building’s existing protection
- Design coverage from a risk assessment
- Coordinate separation distances and equipotential bonding
| Protection level | Based on risk assessment |
|---|---|
| Separation distance | Calculated for structure and current paths |
| Coverage | Confirmed through design review |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Risk assessment
Lightning specialists establish the scheme and protection zones.
2
Coordinated installation
Align air terminals, down conductors and cable routes.
3
Testing and handover
Check continuity and record associated SPD arrangements.
Operation & maintenance guidance
Correct use
- Stop exposed work during thunderstorms
- Inspect equipment alarms after strikes
- Reassess coverage when adding arrays
During operation
- Inspect connection corrosion
- Check loose supports
- Perform required lightning-system inspections
Common misuse
- Installing an air terminal without coordinated protection
- Connecting structures arbitrarily to down conductors
Technical sources & manuals
- DEHN: Lightning and Surge Protection for Rooftop PVwww.dehn-international.com
