Lockout/Tagout and Isolation Equipment

Controls unexpected energisation, movement and stored-energy release during maintenance. Identify PV, grid, battery and auxiliary energy sources.

Features & function

  • People and energy sources need clear identification
  • A stop button is not physical isolation
  • Batteries and capacitors can retain energy

What should you verify when selecting?

  • Match actual switches and mechanisms
  • Define personal and group-lock procedures
  • Assign verification and re-energisation responsibilities
CompatibilityCover actual isolation devices
ResponsibilitiesDefine authorised and supervising personnel
VerificationFollow the site energy-control procedure

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Energy identification

Authorised personnel prepare the equipment isolation list.

2

Isolation execution

Stop, lock and verify under the approved site procedure.

3

Restoration handover

Account for personnel and tools before authorised unlocking and re-energisation.

Operation & maintenance guidance

Correct use

  • Do not remove another person’s lock arbitrarily
  • Use shift handover procedures
  • Reassess changes to isolation boundaries

During operation

  • Check lock condition
  • Update tags and isolation diagrams
  • Review training periodically

Common misuse

  • Switching off the inverter while ignoring live DC
  • Using tags without the required physical locking