Features & function
- Mid-clamps and end-clamps serve different positions
- Some systems also provide electrical bonding
- Torque depends on fasteners and surface condition
What should you verify when selecting?
- Match module frame height
- Check permitted module clamping areas
- Use fastener combinations approved for the structure
| Clamping zone | Use the module installation drawing |
|---|---|
| Height | Match the actual frame |
| Torque | Follow the relevant fastener manual |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Module alignment
Maintain design gaps and locate the permitted clamping zones.
2
Controlled tightening
Use calibrated tools at the specified model-specific torque.
3
Inspection records
Check clamp engagement and missing parts; document sampling checks.
Operation & maintenance guidance
Correct use
- Do not hang other equipment from clamps
- Check accessories when replacing modules
- Investigate the cause of loose connections
During operation
- Inspect frame deformation
- Check loosening and corrosion
- Reinspect abnormal areas after high winds
Common misuse
- Clamping directly onto glass
- Tightening as hard as possible instead of to the specified torque