Features & function
- Manual and robotic methods suit different sites
- Water quality and brushes affect surfaces
- Frequency should follow soiling and economic benefit
What should you verify when selecting?
- Check permitted module-cleaning methods
- Assess water hardness and wastewater disposal
- Check robot loads, boundaries and gap-crossing capability
| Water quality | Meet module-manufacturer requirements |
|---|---|
| Contact load | Follow module/robot compatibility limits |
| Benefit | Evaluate soiling losses against cleaning cost |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Method approval
Choose permitted tools, water quality and work periods.
2
Pilot verification
Test cleaning effectiveness and absence of damage in a representative area.
3
Cleaning operation
Follow the safety plan and record before/after condition.
Operation & maintenance guidance
Correct use
- Never stand on modules or scrape with hard objects
- Avoid thermal shock and high-pressure jets on electrical connections
- Optimise intervals to contamination
During operation
- Clean and replace brushes
- Check robot fall prevention
- Inspect water supply and filtration
Common misuse
- Damaging coatings with abrasive cleaners
- Promising a fixed gain from scheduled cleaning
