Features & function
- Fall arrest needs suitable anchors and a rescue plan
- Electrical protection levels depend on assessed hazards
- PPE does not replace energy isolation
What should you verify when selecting?
- Identify work-at-height and electrical hazards
- Check certification, fit and compatibility
- Provide training and rescue drills
| Rating | Select for the specific risk |
|---|---|
| Anchorage | Confirmed by competent design |
| Inspection | Follow manufacturer and local requirements |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Task assessment
Define work boundaries and engineered safeguards.
2
Equipment checks
Inspect integrity and service validity.
3
Field implementation
Trained personnel follow the plan with appropriate supervision.
Operation & maintenance guidance
Correct use
- Inspect before every use
- Withdraw equipment after impact or damage
- Maintain rescue and communication arrangements
During operation
- Inspect at required intervals
- Clean and store correctly
- Record issue and retirement
Common misuse
- Wearing a harness without a reliable anchor
- Assuming insulating gloves alone make live work safe