Features & function
- Thermopiles and reference cells respond differently
- Mounting angle changes measured values
- Calibration and cleaning affect long-term accuracy
What should you verify when selecting?
- Specify GHI, POA or other measurement planes
- Choose suitable class and response type
- Match logger interfaces and calibration services
| Plane | Specify horizontal, tilted or rear-side |
|---|---|
| Range and accuracy | Match monitoring objectives |
| Calibration | Retain certificates and conversion coefficients |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Measurement definition
Specify the plane and intended performance metric.
2
Positioning
Level the sensor or match array tilt as required.
3
Baseline acceptance
Enter calibration coefficients and inspect clear-sky curves.
Operation & maintenance guidance
Correct use
- Record cleaning and calibration dates
- Do not mix horizontal and tilted irradiance
- Use temperature alongside irradiance when assessing output
During operation
- Clean sensing surfaces
- Recheck alignment and shading
- Recalibrate to manufacturer intervals
Common misuse
- Diagnosing module degradation with a dirty sensor
- Confusing irradiance with daily accumulated irradiation
Technical sources & manuals
- Kipp & Zonen: PV Weather and Resource Monitoringwww.kippzonen.com
