Photograph of an irradiance sensor beside photovoltaic modulesReal photography
Real equipment or site photograph; not a specific model · Source & license
Monitoring & maintenanceCommercial & industrial roofsGround-mounted plants

Soiling Monitor and Clean Reference Device

Compares clean and exposed reference surfaces to inform cleaning decisions. One location cannot completely represent an entire plant.

Features & function

  • Soiling losses vary spatially
  • Rain does not necessarily remove all contamination
  • Cleaning benefits must be weighed against cost

What should you verify when selecting?

  • Choose representative locations
  • Define reference-surface cleaning routines
  • Check relevance to module surfaces and tilt
MetricDefine soiling ratio or loss clearly
CoverageRepresent major pollution differences
MaintenanceFollow reference-device instructions

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Location planning

Consider wind, roads and pollution sources.

2

Device installation

Establish clean and exposed references as specified.

3

Baseline setup

Verify clean conditions and platform ratio calculations.

Operation & maintenance guidance

Correct use

  • Use energy value and water availability in cleaning decisions
  • Record dust storms and rain events
  • Prevent unintended cleaning of the exposed reference

During operation

  • Maintain the clean reference
  • Check sensor abnormalities
  • Compare records with site photographs

Common misuse

  • Cleaning mechanically by calendar alone
  • Equating local bird-dropping loss with uniform plant-wide soiling

Technical sources & manuals

Search stages, equipment, terms and operating issues. Press Esc to close.