Features & function
- High integration requires clear interface responsibilities
- Weight and lifting constraints are significant
- Separation distances follow project-specific design
What should you verify when selecting?
- Confirm total weight and transport restrictions
- Review fire-risk analysis and layout
- Check system-test evidence and servicing space
| Layout | Follow local permits and risk assessment |
|---|---|
| Protection | Suit salt exposure, flooding and temperature |
| Weight | Include actual batteries and auxiliaries |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Site acceptance
Verify foundations, separation, escape and emergency access.
2
Positioning
Use manufacturer lifting points and an approved lift plan.
3
Integrated handover
Jointly accept electrical, thermal-management and fire systems.
Operation & maintenance guidance
Correct use
- Keep surrounding safety zones clear
- Do not add internal loads without approval
- Evacuate and report alarms under the emergency plan
During operation
- Inspect seals, corrosion and leaks
- Check ventilation and pressure-relief components
- Keep emergency access clear
Common misuse
- Treating the container shell as a fire-safety design
- Ignoring emergency access and flood risk