Storage Fire Detection and Interlocking System

Detects smoke, heat or relevant gases and activates designed responses. Fire suppression, pressure relief and rescue strategies require specialist design.

Features & function

  • Early detection and suppression serve different purposes
  • Interlocks should cover BMS, PCS and ventilation
  • Thermal runaway may involve reignition risk

What should you verify when selecting?

  • Use the project fire-risk assessment
  • Verify detector and suppression suitability
  • Coordinate response with emergency services
DetectionBased on battery risks and spatial layout
InterlockingUse the approved logic matrix
MaintenanceFollow manufacturer and fire-authority schedules

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Design review

Define alarm levels and the cause-and-effect matrix.

2

Specialist installation

Install detection and actuating systems to approved drawings.

3

Simulated acceptance

Test alarms and interlocks without creating a fire, following the test plan.

Operation & maintenance guidance

Correct use

  • Evacuate and report alarms under the plan
  • Do not enter an abnormal enclosure without permission
  • Specialists must authorise return to service after an incident

During operation

  • Perform functional tests
  • Inspect suppression media and actuators
  • Update emergency contacts and drill records

Common misuse

  • Assuming portable extinguishers make the system compliant
  • Resetting alarms without removing the fault