Storage Power Conversion System (PCS)

Converts power bidirectionally between battery DC and grid AC, following dispatch commands within battery operating limits.

Features & function

  • Controls charge and discharge direction
  • Grid-connected and island capabilities vary by model
  • Efficiency varies with power and voltage

What should you verify when selecting?

  • Match the battery voltage window
  • Verify BMS protocols and grid certification
  • Define grid-forming or backup requirements
DC rangeCover the permitted battery operating window
PowerMatch battery rate capability and application
ModeConfirm grid-connected or grid-forming functionality

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Engineering coordination

Confirm battery, AC and auxiliary interfaces.

2

Specialist installation

Install isolation, protection, earthing and communications to drawings.

3

Joint commissioning

Verify charging/discharging, protection limits and lost-communication behaviour.

Operation & maintenance guidance

Correct use

  • Track power and losses
  • Retain events before investigating shutdowns
  • Switch only between approved operating modes

During operation

  • Inspect cooling and filters
  • Check termination heating
  • Maintain firmware and setting records

Common misuse

  • Selecting PCS power from battery energy capacity alone
  • Assuming every PCS can supply islanded loads