Features & function
- Multiple MPPTs can accommodate different orientations
- Includes grid protection and monitoring
- High temperature may cause power derating
What should you verify when selecting?
- Check voltage, current and string count per input
- Match local interconnection requirements
- Assess ventilation, noise, maintenance access and support
| DC window | Include coldest and high-temperature conditions |
|---|---|
| AC rating | Follow the interconnection-capacity design |
| Ingress protection | Suit the installation location |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Mounting location
Verify supporting capacity and manufacturer cooling clearances.
2
Electrical connection
Qualified personnel connect DC, AC, earthing and communications to drawings.
3
Authorised commissioning
Apply approved grid settings and test protection and monitoring.
Operation & maintenance guidance
Correct use
- Review daily curves and MPPT differences
- Record alarm codes and operating conditions
- Do not change protection thresholds without authorisation
During operation
- Clean designated cooling passages
- Inspect fans and filters
- Check cable-entry seals and hot spots
Common misuse
- Selecting solely by total module wattage
- Assuming a normal grid-tied inverter supplies power during outages