Surveying, Shading and Site-Assessment Tools

Total stations, distance meters, positioning and shading tools establish roof or terrain models for layout, yield forecasting and quantities.

Features & function

  • Dimensional accuracy affects installable capacity
  • Shading analysis needs annual sun paths
  • Original photographs and control points enable verification

What should you verify when selecting?

  • Match tools to terrain and accuracy needs
  • Define coordinate systems and deliverable formats
  • Survey roof equipment and future shading
AccuracyMeet design and setting-out needs
CoordinatesUse one consistent project system
ShadingCover seasonal and future changes

Installation procedure

This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1

Preparation

Collect ownership drawings, structural plans and safe-access permissions.

2

Field survey

Record boundaries, obstacles, orientation and levels.

3

Results verification

Cross-check critical dimensions before importing into design.

Operation & maintenance guidance

Correct use

  • Retain original point clouds and photographs
  • Recheck the site after design changes
  • Use a fall-protection plan for elevated surveys

During operation

  • Calibrate instruments periodically
  • Protect optics and data storage
  • Maintain survey control points

Common misuse

  • Inferring roof capacity from satellite images alone
  • Ignoring planned neighbouring buildings