Features & function
- Environmental data explains power changes
- Sensor location affects representativeness
- Different arrays may require multiple stations
What should you verify when selecting?
- Configure for plant size and monitoring goals
- Avoid building shadows and exhaust heat
- Provide calibration and maintenance access
| Measured variables | Match performance and safety needs |
|---|---|
| Location | Ensure representative, unobstructed measurements |
| Accuracy | Meet the contractual monitoring class |
Installation procedure
This guide explains installation logic and checkpoints. Dimensions, torque, protection settings, test values and operating sequences must follow approved project documents and the purchased model's manual. Electrical work is for qualified personnel.
1
Site selection
Assess surrounding shading and representation of major arrays.
2
Mounting
Provide stable supports and correctly position sensors.
3
Data validation
Check orientation, units, timestamps and plausible ranges.
Operation & maintenance guidance
Correct use
- Compare weather and generation curves together
- Use approved signal paths for wind protection
- Check sensors before trusting abnormal readings
During operation
- Clean irradiance-sensor surfaces
- Check wind-sensor movement
- Calibrate and record results on schedule
Common misuse
- Substituting nearby city weather for site measurements
- Allowing new structures to shade sensors
Technical sources & manuals
- Kipp & Zonen: PV Weather and Resource Monitoringwww.kippzonen.com
- US Department of Energy: Solar Plant Operations and Maintenance Resourceswww.energy.gov
