What this stage delivers

Commercial & industrial roofsGround-mounted plantsResidential

Deliverables

  • Inverter installation and connection records
  • AC circuits and protection settings
  • Earthing and electrical test reports
  • Metering and grid-interface documents
  • Equipment configuration and software backups

Common oversights

  • Widening grid settings to suppress inverter alarms
  • Interpreting enclosure protection as permission for immersion
  • Ignoring instrument-transformer direction and ratios
  • Assuming AC isolation removes every electrical source

Which equipment is used at this stage?

These entries relate to this stage. Open each for features, selection criteria, installation and operating guidance.

Materials and equipment in this stage
  • String or central inverters
  • AC distribution switchboards
  • Circuit breakers and isolators
  • AC power cables
  • Step-up transformers
  • Revenue meters and instrument transformers
  • Protection relays
  • AC surge-protection devices

Work steps & checkpoints

Medium- and high-voltage work, grid energisation and relay testing require appropriately qualified and authorised personnel.

An inverter may receive DC, AC and storage power simultaneously. Follow the actual manual for discharge waiting times after shutdown.

1

Confirm location and cooling

Select locations for the particular inverter’s mounting, loading and cooling requirements, allowing doors to open and equipment to be serviced or replaced. Assess temperature, direct sun, salt, dust, noise and ponding. Do not obstruct airflow for a neater layout. Accessories and enclosure protection must suit the actual environment.

Checkpoint · Locations meet the model instructions; ventilation and service space remain clear.
2

Complete mounting and protective earthing

Secure equipment using suitable brackets, bases and lifting methods, then inspect attachments and protective earthing. Establish clear earth paths for enclosures, switchboards and trays rather than relying on loose hinges or painted surfaces. Only then proceed with controlled electrical connection under the applicable procedure.

Checkpoint · Mechanical fixing, equipment identification and protective earthing are accepted.
3

Install AC circuits and protection

Connect inverters, switchboards, metering and connection equipment to the approved single-line diagram. Check conductor material, terminal compatibility, phase sequence and neutral requirements. Design determines breaker ratings, short-circuit capability and protection coordination; cable capacity also depends on installation conditions. Record terminations as the manufacturer requires.

Checkpoint · Circuit capacity and protection coordination are traceable, with phase-sequence and termination records.
4

Verify transformation and metering boundaries

Where voltage is stepped up, verify transformer capacity, vector group, earthing and medium-voltage interfaces. Smaller systems must clearly define low-voltage connection and metering arrangements. Check instrument-transformer direction, ratios, seals and settlement boundaries against utility requirements so apparent generation on a dashboard does not conceal reversed settlement readings.

Checkpoint · Metering direction and ratios agree, and transformation and connection follow the approved scheme.
5

Configure grid parameters under authorisation

Authorised commissioning staff should set the applicable grid code, power control and protection from connection approvals and manufacturer procedures. Do not widen voltage or frequency ranges or disable anti-islanding to silence alarms. Record software versions, configuration sources and permissions so upgrades cannot change grid behaviour without a record.

Checkpoint · Settings are approved and backed up; unauthorised users cannot change protection parameters.
6

Complete interface checks before energisation

Check isolation, warnings, closed enclosures, test records and defect closure before energisation. Confirm operating boundaries with the utility or facility electrical team. Qualified personnel must carry out switching, energisation and protection tests under approved procedures; this website explains the work stages and deliverables rather than issuing operating instructions.

Checkpoint · Prerequisite inspections, the energisation plan and responsibilities are confirmed.

Stage acceptance checklist

For learning and project preparation; not a replacement for formally signed acceptance. Checkmarks are saved only in this browser.

0 / 5 checked

View all records

Original technical sources

Sources provide general background or model-specific information. Foreign standards do not replace local requirements; obtain the latest manuals for the actual equipment before purchasing or construction.