Capacity & generation estimate

Use formulas to understand relationships, not to replace design or investment analysis. Default values are illustrative and can be replaced with project data.

Enter project assumptions

What do these results tell you?

  • DC capacity is the sum of module ratings, not the AC output limit.
  • Annual generation uses E = P_STC × H_POA / G_STC × PR. The assumed PR must match the actual system boundary and loss definitions.
  • Actual generation also depends on local weather, shade, temperature, equipment efficiency, curtailment, outages, soiling and degradation.
  • Bifacial gains, hourly clipping, storage dispatch, tariffs, self-consumption and financial returns are not included.
  • This tool does not calculate safe string voltage, structural loads, protection settings or cable sizes; these require professional design verification.

Reference: PVsyst: system yield and performance ratio. This tool supports understanding of units and concepts.

Search stages, equipment, terms and operating issues. Press Esc to close.