Photovoltaics (PV)
Technology that converts light into electricity using semiconductor materials. Modules produce DC; the complete system also includes structures, conversion, protection and connections.
From reading your first drawing to understanding equipment manuals. Search terms or definitions to clarify concepts before project details.
35 terms
Technology that converts light into electricity using semiconductor materials. Modules produce DC; the complete system also includes structures, conversion, protection and connections.
Units of module peak power under specified standard test conditions. They describe nominal capacity, not continuous output throughout the day.
Units of energy generated, consumed or stored over time. They differ from kW, which measures power at a particular moment.
Common test conditions used to compare module ratings. Actual output differs with on-site temperature, irradiance and spectrum.
A module that receives light and generates from both faces. Rear-side gain depends on ground reflectance, height, structural shading and layout.
Tunnel oxide passivated contact cell technology. A technology label does not replace model-specific efficiency, temperature-coefficient and reliability data.
A cell technology using different semiconductor structures at interfaces. Compare performance and application limits using the actual module datasheet.
Voltage across an open module or string circuit. String open-circuit voltage at the design minimum temperature is important when checking equipment input limits.
The current parameter for a module under specified short-circuit conditions, used in design calculations. Measurement requires suitable equipment and a professional method; do not simply short terminals.
The voltage at which a module produces maximum power under given conditions. String operating voltage must match the inverter tracking range.
A control function that adjusts the electrical operating point to capture available power. Mixed orientations or shading on one input require design analysis.
A designed series connection of modules. Voltages add, so both low-temperature open-circuit voltage and high-temperature operating voltage must meet constraints.
The ratio of total module DC nameplate power to inverter AC rated power. An appropriate value depends on resources, equipment and project economics.
Available DC energy not delivered when power exceeds inverter output capability or a control limit. Assess it alongside the gains from additional capacity at other times.
The horizontal direction the array faces. Software can use different zero points and direction conventions; confirm the definition before entering data.
The angle between the module plane and horizontal. Selection balances solar resources, shading, roof conditions, wind, snow and maintenance.
An indicator relating array coverage to its ground footprint, used in layout and shading analysis. Check the area definition used by the particular software.
System components other than modules, commonly including mounting, cables, inverters and distribution equipment. Cost reports may draw the boundary differently.
Equipment that converts DC to AC and provides its specified control and protection functions. A grid-connected model does not automatically provide independent backup power.
A device that limits transient overvoltage and must match system voltage, topology and lightning-protection design. It is not the entire lightning-protection system.
Designed connections between conductive parts to reduce voltage differences. A structural joint does not automatically demonstrate electrical continuity.
Protection that detects and prevents unintended island operation under specified conditions. It must not be disabled or altered just to remove alarms.
The share of PV generation used by local loads. Define whether the calculation includes energy routed through storage and its losses.
An indicator relating actual energy to irradiance and nominal capacity. Metering boundaries, temperature correction and data quality affect comparisons.
The proportion of a defined time or energy basis during which equipment is able to operate. Contracts should specify exclusions and calculation methods.
Loss caused by dust, pollutants or related surface coverage. It varies by location and season; cleaning decisions should balance cost and recovered energy.
A curve relating current and voltage that can help diagnose mismatch and other issues. Interpret it with irradiance, temperature and equipment parameters.
A controlled test observing cell luminescence to help identify some cracks and abnormalities. Results require professional interpretation.
A method of visualising surface temperatures. Reflections and operating and imaging conditions affect interpretation; a hot-spot image alone is not a complete diagnosis.
A system that monitors battery condition and participates in control and protection. Users must not bypass it to force additional capacity or power.
Equipment converting electricity between storage and the grid or loads. Grid-connected, islanded, power and compatibility capabilities must be verified for the model.
A system that schedules energy around loads, prices and equipment limits. Optimisation must respect battery and grid safety constraints.
An estimate of the battery’s remaining charge state. A displayed percentage does not guarantee rated-power discharge under every condition.
A cost per unit of energy based on lifetime costs and generation. Discounting, decommissioning and replacement assumptions affect the result.
Replacing or reconfiguring equipment to improve performance and life. It can change capacity, loading and electrical interfaces, requiring renewed design and approval checks.